What to Expect While Living Through a Renovation, from Demolition to Handover?

renovation builders perth

The Disruption Associated With The Construction

The value of residential alterations and additions was $1.32 billion in the September 2026 quarter in Australia, which is an increase of 0.8% seasonally adjusted, according to the Australian Bureau of Statistics. It represents the whole country, not the state of Western Australia. There are thousands of projects involved, which makes the construction boom not very evident to a person who lives nearby.

To a householder, this number is just additional information. The single kitchen or bathroom alteration takes all attention, and disruption experienced daily is even higher.

Should You Stay Or Move Out?

The first important decision a homeowner makes before any contractors from renovation builders Perth start is to decide whether to move out or stay in the property. The former option means extra costs of temporary accommodation, and the latter means monitoring the process. In addition, there will be dust and noise, possible interruptions of water or electricity, and perhaps several weeks without kitchen use.

There are many practical aspects to consider. Is there any functional bathroom left? Does anyone work from the property? Is there anyone young or old living in the property? Of course, money is an issue, but comfort and health are also essential.

Asbestos In Older Perth Houses

renovation builders perth

Demolition can reveal materials that a homeowner might not know about. Healthy WA explains that properties constructed before 1990 are probably going to have asbestos-containing materials somewhere.

It can be used in wall and ceiling panels, especially in wet areas, behind the wall tiles, vinyl floor tiles, eaves linings, roof sheeting, fences and sheds. Also, asbestos could be present under the newer renovations.

Undamaged asbestos cement is considered to be a non-harmful material when it is not damaged. Any cutting, drilling, sanding or cleaning of asbestos with pressure equipment poses the risk of releasing dangerous fibres into the environment. Therefore, homeowners need to check for asbestos-containing materials before the work starts.

Asbestos must be removed by a licensed asbestos removal contractor. Repairs need to be done by a qualified tradesperson and asbestos must be disposed of at approved disposal sites.

Owners of the properties should clarify how builders deal with the suspect materials and who is going to arrange testing.

Construction Scheduling

While each builder develops their own project schedule, there is a certain standard sequence of works in the renovation. Demolition and modification of the structure are the first steps. Next come plumbing and electrical works. After that walls and ceilings are lined. Fit-out work and finishing come later, with painting and fixing of fittings carried out almost on the final stage of works.

Sometimes weather or permissions influence construction scheduling. Late delivery of materials or wrong measures of windows or mistakes found during demolition; all that may lead to delays.

Having a written construction program that contains dates when every stage has to be completed enables monitoring of the progress. Reviewing it every two weeks will allow finding delays in a timely manner. Variations influence the schedule too, so any extra work done has to be documented in advance.

Arranging walk-throughs at certain stages is useful too. The checking of positions of pipes and points before covering walls takes several minutes. The corrections of it after lining the walls may take days.

Neighbours, Waste And Documents

The renovation influences not only the owner but other householders. Informing your neighbours of the schedule and noise level prior to bringing skip bins allows for an easier eight weeks. Skip bins and trade vehicles require space and therefore need explaining where they are to be brought by the builder.

The disposal of waste requires planning in advance. Asbestos cement is controlled waste and cannot be deposited in the common skip bin. Homeowners need to find out if this is included in the builder’s quote, since the disposal of other materials is also necessary.

At handover, all documents regarding the project have to be received. That will include warranties and manuals, electrical and plumbing certificates, and home indemnity insurance details for the big projects.

Keeping all documents in one folder facilitates management of the project during future property sale or insurance claim. During the final inspection, it is necessary to prepare a written list of defects signed by both parties.